好爽…又高潮了毛片喷水,亚洲 都市 校园 激情 另类,少妇荡乳情欲办公室,久久久久久久久久

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.lishankj.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

濟(jì)南木工加工棚:現(xiàn)場(chǎng)防護(hù)棚應(yīng)該怎么做?去現(xiàn)場(chǎng)看看做對(duì)了沒

來(lái)源:http://www.lishankj.com/   發(fā)布時(shí)間:2024-09-15

  一般規(guī)定

  general provisions

  1.防護(hù)棚框架體系采用型鋼材料,型材具體規(guī)格應(yīng)根據(jù)荷載進(jìn)行核算,編制專項(xiàng)方案。

  1. The protective shed frame system adopts steel materials, and the specific specifications of the profiles should be calculated according to the load, and a special plan should be prepared.220543198043643974

  2.防護(hù)棚頂棚上層有防雨措施,并設(shè)不小于5%坡度的排水坡。非防砸范圍可使用單層頂棚。處于高空墜物半徑內(nèi)或處于起重機(jī)臂桿回轉(zhuǎn)范圍之內(nèi)時(shí),頂棚需采用雙層硬防護(hù),高度應(yīng)為700mm,硬質(zhì)防護(hù)應(yīng)采用厚度不小于50mm木板等材料。3.防護(hù)棚頂部采用戶外車貼形式粘貼標(biāo)語(yǔ)、標(biāo)識(shí),標(biāo)語(yǔ)為藍(lán)底白字,上、下弦張貼50mm~100mm寬紅白警示帶。

  2. The upper layer of the protective shed ceiling is equipped with rainproof measures and a drainage slope with a slope of not less than 5% is set up. A single-layer ceiling can be used in non smash resistant areas. When within the radius of falling objects from high altitude or within the range of crane arm rotation, the ceiling should be protected with double-layer hard protection, with a height of 700mm. The hard protection should be made of materials such as wooden boards with a thickness of not less than 50mm. 3. The top of the protective shed adopts outdoor car stickers to paste safety slogans and signs. The slogans are blue with white letters, and red and white warning tapes with a width of 50mm~100mm are posted on the upper and lower strings.

  02配電箱防護(hù)棚

  02 Distribution box protective shed

  1.總配電箱、固定式分配電箱需設(shè)置防護(hù)棚,穩(wěn)固安置在混凝土承臺(tái)上。2.電箱防護(hù)圍欄主框架不小于40mm×40mm×2.5mm方管,柵欄不小于20mm ×20mm×2mm方管 3.配電箱操作面鋪設(shè)絕緣踏板或膠墊。4.防護(hù)圍欄正面懸掛操作規(guī)程、責(zé)任標(biāo)識(shí)牌、警示標(biāo)志等,外側(cè)配備消防器材。5.圍欄的長(zhǎng)寬可根據(jù)實(shí)際需要進(jìn)行調(diào)整。

  1. The main distribution box and fixed distribution box need to be equipped with protective sheds and securely placed on concrete platforms. 2. The main frame of the protective fence for the electrical box shall not be less than 40mm x 40mm x 2.5mm square tube, and the fence shall not be less than 20mm x 20mm x 2mm square tube. 3. Insulation pedals or rubber pads shall be laid on the operating surface of the distribution box. 4. Hang operating procedures, responsibility signs, warning signs, etc. on the front of the protective fence, and equip fire-fighting equipment on the outside. The length and width of the fence can be adjusted according to actual needs.

  1.防護(hù)棚采用工字鋼方管等型材加工,組合式連接,架體結(jié)構(gòu)應(yīng)滿足要求。各種型材及構(gòu)配件具體規(guī)格應(yīng)根據(jù)當(dāng)?shù)仫L(fēng)荷載、雪荷載進(jìn)行核算,編制專項(xiàng)方案。如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。2.防護(hù)棚頂部正面設(shè)置企業(yè)標(biāo)識(shí)、“鋼筋加工棚”、警示標(biāo)志,其余各面設(shè)宣傳標(biāo)語(yǔ)。內(nèi)部懸掛操作規(guī)程。3.頂棚底部距地面高度不低于3000mm。頂棚鋪設(shè)防砸、防雨雙層防護(hù)。立柱宜采用不低于150mm×150mm×3mm 方管;橫撐及斜撐為100mm×50mm×2.5mm 方管;桁架主梁采用100mm×100m×2.5mm方管;主梁上部以80mm×40mm×2.5mm 方管搭設(shè)龍骨。4.各節(jié)點(diǎn)連接的兩端可接不低于10mm厚的鋼板,以M12的螺栓連接,方便拆卸周轉(zhuǎn)使用。5.立柱基礎(chǔ)澆筑700mm×70mm×700mm混凝土,預(yù)埋300mm×300mm ×12mm鋼板。???裝配式防護(hù)棚節(jié)點(diǎn)連接鋼筋加工棚立柱底板示意?04

  1. The protective shed is processed with profiles such as I-beams and square tubes, and connected in a combination. The frame structure should meet safety requirements. The specific specifications of various profiles and components should be calculated based on local wind and snow loads, and a special plan should be prepared. In case of a typhoon, windproof measures should be taken, and cable wind ropes can be installed. 2. The front of the top of the protective shed shall be equipped with the enterprise logo, "Steel Processing Shed", warning signs, and safety propaganda slogans on all other sides. Internal hanging safety operating procedures. 3. The height from the bottom of the ceiling to the ground shall not be less than 3000mm. The ceiling is equipped with double layered protection against smashing and rain. Column should be made of square tube not less than 150mm × 150mm × 3mm; The cross brace and slant support are 100mm × 50mm × 2.5mm square tubes; The main beam of the truss adopts 100mm × 100m × 2.5mm square tubes; A keel is erected on the upper part of the main beam using 80mm × 40mm × 2.5mm square tubes. 4. Both ends of each node connection can be connected to steel plates with a thickness of no less than 10mm, and connected with M12 bolts for easy disassembly and turnover. 5. Pour 700mm × 70mm × 700mm concrete into the column foundation, and embed 300mm × 300mm × 12mm steel plates.??? What is the schematic diagram of the connection between the nodes of the prefabricated protective shed and the bottom plate of the steel processing shed column? 04

  1.木工加工棚凈空高度不低于3000mm,結(jié)構(gòu)形式類似鋼筋加工防護(hù)棚,立柱與地面連接牢靠。2.地面需硬化,防護(hù)棚內(nèi)宜增設(shè)防塵降噪措施,配備滅火器材,驗(yàn)收牌、警示牌等圖牌。??05

  1. The clearance height of the woodworking processing shed shall not be less than 3000mm, and the structural form shall be similar to that of a steel reinforcement processing protective shed. The columns shall be firmly connected to the ground. 2. The ground needs to be hardened, and dust and noise reduction measures should be added to the protective shed. Firefighting equipment, inspection signs, warning signs, and other signs should be equipped.?? 05

  1.施工現(xiàn)場(chǎng)未集中使用的中小型機(jī)械應(yīng)設(shè)置單體防護(hù)棚。2.防護(hù)棚采用工字鋼、方鋼等型材加工,同鋼筋棚加工方式,可組合式連接,架體結(jié)構(gòu)應(yīng)滿足要求。單體防護(hù)棚基礎(chǔ)施工應(yīng)經(jīng)設(shè)計(jì)計(jì)算確定,底部與基礎(chǔ)采用膨脹螺栓固定。

  Small and medium-sized machinery that is not centrally used on the construction site should be equipped with individual protective sheds. 2. The protective shed is made of profiles such as I-beams and square steel, and can be connected in combination with the steel reinforcement shed processing method. The frame structure should meet safety requirements. The construction of a single protective shed foundation should be determined through design calculations, and the bottom and foundation should be fixed with expansion bolts.

  本文由 木工加工棚  友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊   http://www.lishankj.com  真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from the woodworking processing shed. For more related knowledge, please click http://www.lishankj.com Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned

99久久亚洲精品无码毛片| 国模冰冰大胆瓣开下部| 天天澡天天狠天干天啪啪小说| CHINESE国产XXXX实拍| 欧美激情综合色综合啪啪五月| 免费做A爰片久久毛片A片| 无码免费人妻A片AAA毛片| 国产天美传媒性色AV| 成 人 免费 黄 色 网站视频| 孰妇XXXXXX的性生话| 337P粉嫩日本亚洲大胆艺术| 一性一交一口添一摸视频| 白嫩无码人妻丰满熟妇啪啪区百度| 色窝窝亚洲AV网在线观看 | 被黑人猛烈30分钟视频| 精品无码国产自产拍在线观看| 精跪趴灌满白浊共妻NP老师学生| 高潮A片WWW张柏芝陈冠希| 高中小鲜肉自慰GAY免费| 加勒比色综合久久久久久久久| 在线免播放器高清观看| 黄到下面流水的爽文很污的情话 | 国产AV被C呻吟双腿视频| 国产极品尤物粉嫩泬在线观看| 丰满爆乳无码一区二区三区| 亚洲成AV人无码亚洲成AV无码| 全部孕妇毛片丰满孕妇孕交| 成年美女黄网站色大免费视频| 色哟哟网站入口在线观看视频| 亚洲欧美精品无码大片在线观看 | 色婷婷狠狠18禁久久YYY| 与亲女洗澡时伦了视频 | 一边吃奶一边添P好爽视频| 欧美性色欧美A在线在线播放| 国产98在线 | 欧美| 精品人妻AV区乱码| 没带罩子让他捏了一节课| 亚洲精品无码专区久久久| 少妇伦子伦精品无码STYLES | А√天堂资源中文在线地址BT| 国产一区二区三区AV精品|